Section 01Quality & traceabilityRev ASheet 1/4
We only claim what we can show.
Five records are tied to your PO. Here is each one, the instruments behind the inspection record, and how to come and check for yourself.
Section 02The records chainRev ASheet 2/4
Every part traces back to its bar.
Samples of each record are shown below. The real ones carry your PO number.
Section 03Inspection instrumentsRev ASheet 3/4
What the inspection record is measured with.
The first piece is checked against the drawing before production runs, then re-checked at each stage.
| Instrument | Range | Resolution |
|---|---|---|
| Vernier caliper, Mitutoyo / Baker | 0–300 mm | 0.01 mm |
| Micrometers | 0–150 mm | 0.001 mm |
| Bore gauges, plunger dial | 1–150 mm | Bearing fits |
| Height gauge, Mitutoyo | 0–400 mm | Lever dial |
Every lot ships with
- 01Signed inspection report with measured critical dimensions
- 02Material test certificate
- 03Delivery challan with PO number, batch, quantity and date
- 04Packing matched to the part, with handling marks
Section 04AuditsRev ASheet 4/4
Audits welcome.
Buyer and quality audits are welcome, by appointment, before the first order. Bring your own checklist.
Book an audit visit
aman@viorim.com · +91 77383 22282 · Mumbai & Vadodara
Send a drawing.
Itemised quote within 48 hours. Every drawing is treated as confidential.